The SOUTHWIRE 3010 is a 1-hole, long-barrel compression lug designed for copper conductor terminations in medium-voltage electrical systems. Rated for 350 kcmil conductors and 35 kV service, it delivers a 486-amp current capacity suitable for demanding power distribution applications. The copper construction provides reliable conductivity and corrosion resistance. The long barrel design maximizes contact area between the lug and conductor, reducing resistance at the termination point. Electricians and linemen working on switchgear, transformers, and service entrance equipment will find this lug suited for both new installation and maintenance work.
This compression lug is intended for use in medium-voltage power distribution systems, including commercial and industrial switchgear, transformer connections, and service entrance terminations. The 1/2-inch stud hole and 1/2-inch mounting hole accommodate standard hardware used in panel and switchgear assemblies. The tongue measures 1.13 inches wide, and the overall length is 3.5 inches, fitting within standard termination clearances in medium-voltage equipment enclosures.
Key Features
Long-barrel design increases conductor contact area for lower termination resistance
Rated for 350 kcmil copper conductors with a 486-amp current capacity
35 kV voltage rating suitable for medium-voltage distribution applications
1/2-inch stud size and 1/2-inch mounting hole for compatibility with standard hardware
1-hole tongue configuration for straightforward lug-to-bus or lug-to-stud mounting
Copper construction for high conductivity and long-term reliability
Compatibility
Designed as an OEM-style compression termination lug for 350 kcmil copper conductors in medium-voltage electrical assemblies rated up to 35 kV.
Installation Notes
Installation should be performed by a licensed electrician following NEC requirements for medium-voltage terminations. De-energize and lock out the circuit before beginning any termination work. Use a calibrated compression tool sized for the 350 kcmil range to ensure a proper crimp - under-crimped connections can cause overheating at the termination point. Verify stud torque against equipment manufacturer specifications and confirm all insulation clearances meet applicable code requirements for 35 kV service.