The SIEMENS UAT414-XGF is a 200-amp, 4-jaw ringless meter socket designed for both overhead and underground service installations. It ships as a single-position unit with no bypass switch, making it a straightforward replacement or new-construction metering enclosure for residential and light commercial electrical service entrances. The ringless design eliminates the need for a locking ring during meter installation and removal, which is a common utility requirement in many service territories. Licensed electricians install this socket as part of a code-compliant service entrance assembly.
This meter socket is suited for single-position metering applications where the utility requires a ringless enclosure. The overhead and underground (OH/UG) rating makes it adaptable to either service feed configuration, reducing the need to stock separate SKUs for different job types. The stainless steel hub and MEG approval indicate utility-grade construction intended to meet common utility specification requirements. It is appropriate for residential service upgrades, new construction, and multi-tenant metering panel replacements where a single-gang, 200-amp ringless socket is specified.
Key Features
200-amp continuous rating suitable for full residential service entrance loads
4-jaw socket configuration meets standard single-phase utility meter requirements
Ringless cover design aligns with utility specifications that prohibit ring-type enclosures
Rated for both overhead and underground service entry, eliminating separate SKUs for each feed type
No bypass switch configuration keeps the unit compact and code-straightforward for standard installations
MEG approved construction meets utility metering equipment group standards common across multiple service territories
Compatibility
Designed as an OEM-style replacement or new-installation meter socket for 200-amp single-position residential and light commercial service entrances requiring a 4-jaw ringless enclosure with OH/UG capability.
Installation Notes
Installation must be performed by a licensed electrician in accordance with the National Electrical Code (NEC) and applicable local utility requirements. De-energize the incoming service and coordinate with the utility company before removing or installing the meter socket, as the line-side lugs may remain energized until the utility pulls the meter. Verify that the enclosure mounting, conduit entry, and grounding bonding meet local AHJ and utility inspection requirements before requesting meter set.