The SIEMENS SN551CR is a single-phase Talon meter socket designed for surface-mount installation in electrical metering applications. Rated at 100 amps, it features a 5-jaw ring configuration with 5 positions and no bypass switch (No BPS). This socket provides a secure, code-compliant termination point for utility metering equipment and is installed by licensed electricians in both residential and light commercial settings. Its surface-mount design simplifies installation on flat panel or wall surfaces without requiring a recessed enclosure. At 44 pounds, the unit is a substantial, robust assembly built for long-term service in metered electrical distribution systems.
The SN551CR is suited for single-phase metering installations where a surface-mounted socket is required. Typical applications include residential meter bases, light commercial utility metering points, and electrical distribution setups that call for a standard 5-jaw ring meter socket without an integrated bypass switch. The 5-position jaw ring accommodates standard utility meter form factors used across most North American utility service territories.
Key Features
100-amp current rating for single-phase metering service
5-jaw ring configuration for compatibility with standard utility meters
5-position socket layout supports standard North American meter forms
Surface-mount design for straightforward wall or panel installation
No bypass switch (No BPS) configuration simplifies the assembly
Robust construction at 44 pounds for durable, long-term field service
Compatibility
Designed as an OEM-style single-phase surface-mount meter socket for use with standard 5-jaw utility meters in 100-amp residential and light commercial metering applications.
Installation Notes
Installation must be performed by a licensed electrician in accordance with the National Electrical Code (NEC) and applicable local utility requirements. Confirm that utility power is fully disconnected and the service is de-energized before mounting or making any terminations at the meter socket. Verify that the mounting surface can support the weight of the assembly and that all conduit entries are properly sealed and secured. Do not energize the socket until the utility meter is seated and the installation has been inspected per local authority having jurisdiction (AHJ) requirements.