The LAARS 20052005 is a 6-inch pilot sensor lead assembly designed to carry flame sensing signals between the pilot sensor and the ignition control module in boiler systems. This electrical connection component maintains a continuous low-voltage signal path, allowing the control circuit to verify flame presence and respond to combustion conditions in real time. The assembly connects directly between the sensing unit and the control section with no additional modifications required. It is a direct OEM replacement part installed by licensed HVAC technicians and boiler service professionals during routine maintenance or combustion control troubleshooting.
This lead assembly is suited for residential and light commercial boiler applications where pilot-based ignition systems are in use. It supports stable flame verification throughout the combustion control sequence, reducing the risk of nuisance lockouts or erratic ignition response. The 6-inch length fits the standard routing between pilot sensor and control module in compatible LAARS boiler configurations. Technicians will typically encounter this part when diagnosing intermittent ignition faults or replacing aging signal wiring as part of a combustion system overhaul.
Key Features
Transfers flame sensing signals between pilot sensor and ignition control module
Maintains continuous electrical path for real-time flame verification
6-inch length fits standard pilot sensor to control module routing
Direct-connect design requires no additional modifications for installation
Supports stable ignition response and reduced cycle interruptions
Compatibility
Designed as an OEM-style replacement pilot sensor lead assembly for compatible LAARS boiler systems equipped with pilot-based ignition and flame sensing controls.
Installation Notes
Installation should be performed by a qualified HVAC technician or licensed boiler service professional. Before servicing, shut down the boiler, switch off electrical power at the disconnect, and allow the system to cool. Verify the replacement lead assembly routing clears all heat sources and moving parts before restoring power. Follow all applicable local mechanical and electrical codes during installation.