The EDWARDS BPSEQ is a seismic battery hold-down kit designed to secure internal batteries within BPS-series booster power supply cabinets. When installed, the kit enables the booster power supply to meet OSHPD pre-approval requirements for Importance Factor 1.5 seismic anchorage. This makes it a required component for life-safety fire alarm installations in seismic zones where OSHPD compliance is mandated. The BPSEQ is installed by licensed fire alarm or low-voltage technicians as part of a compliant system build or retrofit.
This hold-down kit is intended for use in commercial and institutional settings where seismic bracing of fire alarm power supply equipment is required by code or authority having jurisdiction. It is specifically designed to fit BPS6A, BPS6AC, BPS10A, BPS10AC, MIRBPS6, and MIRBPS10 cabinet enclosures. Facilities such as hospitals, clinics, and other healthcare or critical-occupancy buildings that fall under OSHPD jurisdiction will require this kit to achieve compliant seismic anchorage of the booster power supply batteries.
Key Features
Secures internal batteries within BPS-series booster power supply cabinets during seismic events
Enables OSHPD pre-approval compliance for Importance Factor 1.5 seismic anchorage
Compatible with BPS6A, BPS6AC, BPS10A, BPS10AC, MIRBPS6, and MIRBPS10 cabinets
Designed as a direct-fit accessory for EDWARDS BPS-series booster power supplies
Required component for seismic-compliant fire alarm power supply installations in qualifying jurisdictions
Compatibility
Compatible with EDWARDS BPS6A, BPS6AC, BPS10A, BPS10AC, MIRBPS6, and MIRBPS10 series booster power supply cabinets.
Installation Notes
Installation should be performed by a licensed fire alarm technician or low-voltage contractor familiar with NFPA 72 requirements and applicable seismic codes. Power down the booster power supply and disconnect all power sources, including AC input and battery leads, before beginning work inside the cabinet. Verify that the installation meets local AHJ and OSHPD requirements before returning the system to service. Do not modify the hold-down hardware or substitute non-listed components, as doing so may void seismic pre-approval status.