

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE YSJ102A3S0H005S is a packaged gas-electric rooftop unit designed for commercial heating and cooling applications. This gas pack combines a gas furnace and a mechanical cooling section in a single cabinet, delivering both heating and air conditioning from one rooftop installation. Rated at 8.5 tons of cooling capacity and configured for 208/230-volt, three-phase power, it is suited for light commercial buildings where a single outdoor unit handles the full HVAC load. Installation and service are performed by licensed commercial HVAC technicians familiar with packaged rooftop equipment.
Packaged gas-electric units in the YSJ series are deployed on rooftop curbs or ground pads serving commercial spaces such as retail, light industrial, and small office buildings. The three-phase electrical configuration at 208/230 volts makes this unit appropriate for facilities with commercial power infrastructure. At 8.5 tons, this unit falls in the range commonly used for medium-sized commercial zones requiring dedicated packaged equipment rather than a split-system approach.
Designed as an OEM packaged gas-electric rooftop unit within the TRANE commercial product line. No additional compatible model numbers or replacement part numbers were specified in the available product data.
This unit must be installed by a licensed commercial HVAC contractor in accordance with local mechanical codes and the applicable provisions of the IFGC and NEC. Disconnect and lock out all electrical power and close the gas supply shutoff before servicing. Proper rooftop curb sizing and structural load verification are required prior to placement. Gas piping, refrigerant circuits, and electrical connections must be inspected and commissioned before startup.
Thanks for subscribing!
This email has been registered!