

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE YSC036G3RMB20CP is a packaged rooftop unit (RTU) configured as a gas-pack, meaning it integrates both a gas heating section and a direct-expansion cooling system in a single cabinet. Rated at 3 tons (36,000 BTU/h) of cooling capacity, the unit operates on 208/230V, 3-phase power and uses R-410A refrigerant. It is designed for commercial rooftop installations and is intended for service by licensed HVAC technicians familiar with commercial packaged equipment. The gas-pack configuration eliminates the need for a separate indoor furnace or air handler, consolidating the heating and cooling system into one rooftop-mounted assembly.
The YSC036G3RMB20CP is suited for light commercial applications such as small office buildings, retail spaces, and similar single-zone or multi-zone commercial structures requiring both heating and cooling from a single rooftop platform. The 3-ton capacity targets spaces in the range typical of small commercial occupancies. The 3-phase electrical configuration is standard for commercial construction where three-phase service is available at the rooftop disconnect. This unit is part of the Trane Precedent product line, which is positioned for commercial replacement and new-construction rooftop applications.
Designed as an OEM packaged rooftop gas-pack replacement or new-installation unit for light commercial systems requiring 3-ton capacity at 208/230V, 3-phase electrical service.
Installation must be performed by a licensed HVAC technician holding appropriate EPA Section 608 certification for R-410A refrigerant handling. Disconnect and lock out all electrical power and shut off the gas supply at the service valve before any service or installation work. Rooftop curb dimensions and duct connection orientation must be verified against the unit's specifications before setting the cabinet. All gas piping and electrical connections must comply with the applicable local mechanical codes and the National Electrical Code (NEC).
Thanks for subscribing!
This email has been registered!