

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 50 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE YHC067E3RMA43R8 is a packaged rooftop gas-electric air conditioner rated at 5 tons of cooling capacity. It operates on R-410A refrigerant and is wired for 208/230-volt, 3-phase power, making it suited for light commercial rooftop applications where both cooling and gas heat are required in a single cabinet. The unit is configured as a gas-pack, combining a direct-expansion cooling system with a gas heat section. Licensed HVAC technicians and commercial refrigeration contractors typically handle specification, installation, and commissioning of this equipment.
This unit is designed for light commercial rooftop installations where a self-contained heating and cooling solution is needed. The 3-phase electrical configuration makes it appropriate for small commercial buildings, retail spaces, and similar occupancies with 208/230-volt 3-phase service. As a convertible unit, it offers flexibility in ductwork orientation to match the mechanical design of the building.
Designed as an OEM packaged rooftop gas-electric unit for light commercial applications requiring 5-ton capacity, 3-phase power, and R-410A refrigerant. Consult the equipment schedule and mechanical drawings to confirm fitment with existing curb and duct configurations before ordering.
Installation must be performed by a licensed HVAC contractor holding the appropriate EPA Section 608 certification for R-410A refrigerant handling. The unit should be mounted on an approved rooftop equipment curb sized to the equipment footprint, and all electrical connections must comply with NEC requirements for commercial HVAC equipment. Gas supply piping and combustion venting must be installed per IFGC guidelines and local authority having jurisdiction. Disconnect all power and shut off the gas supply at the service valve before performing any service or maintenance work on this unit.
Thanks for subscribing!
This email has been registered!