

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE YHC060F4RMA005D is a commercial gas-pack rooftop unit rated at 5 tons of cooling capacity and designed for 460-volt, 3-phase electrical service. A gas pack combines heating and cooling in a single self-contained cabinet, typically mounted on a rooftop curb or a ground-level pad. The unit delivers both gas-fired heat and refrigerant-based cooling through a single supply-and-return duct connection to the conditioned space. At 5 tons of capacity, this unit is suited for light commercial applications where a single packaged system replaces separate indoor and outdoor components. Installation and service are performed by licensed commercial HVAC technicians.
This gas-pack rooftop unit is intended for light commercial applications such as small retail spaces, office suites, restaurants, and similar structures requiring a packaged heating and cooling solution. The 3-phase, 460-volt electrical configuration is standard for commercial buildings with a three-phase power distribution panel. The self-contained design simplifies rooftop or ground-level installation by consolidating the refrigerant circuit, gas heat exchanger, controls, and blower assembly into one cabinet. Duct connections are typically made at the unit curb, reducing on-site refrigerant work compared to split systems.
Designed as an OEM-style replacement or direct installation unit for light commercial gas-pack rooftop applications requiring 5-ton capacity and 460-volt, 3-phase power supply.
Installation must be performed by a licensed commercial HVAC technician in compliance with local mechanical codes, the IFGC, and applicable electrical codes including the NEC. Disconnect and lock out all electrical power and shut off the gas supply before servicing or making connections. Verify curb dimensions and duct opening alignment before setting the unit. Gas line sizing, flue venting configuration, and electrical supply conductors must be confirmed prior to startup.
Thanks for subscribing!
This email has been registered!