

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 500 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE YHC047E3RMA1VYE is a gas-pack packaged HVAC unit built for commercial and light-commercial rooftop or ground-level installations. This self-contained unit integrates gas heating and electric cooling into a single cabinet, consolidating the refrigeration circuit, heat exchanger, and air-handling components. Rated at 4 tons of cooling capacity and powered at 208/230V three-phase, it is sized for medium commercial spaces and is typically installed by licensed HVAC technicians on rooftop curb mounts or slab pads. The three-phase power supply makes it suited for light-commercial occupancies where three-phase electrical service is standard.
The YHC047E3RMA1VYE fits light-commercial applications including retail spaces, small office buildings, and similar occupancies requiring combined heating and cooling from a single rooftop or ground-mounted unit. Its gas-pack configuration delivers forced-air heating through a gas-fired heat exchanger while the integrated refrigeration circuit handles cooling, eliminating the need for a separate indoor air handler or furnace. This consolidated design reduces mechanical room requirements and simplifies service access for HVAC contractors.
Designed as an OEM packaged gas-pack unit for light-commercial rooftop or ground-level HVAC applications requiring 4-ton cooling capacity and 208/230V three-phase power.
Installation must be performed by a licensed HVAC technician in accordance with local mechanical codes, the National Fuel Gas Code (NFPA 54), and NEC requirements for three-phase commercial equipment. Disconnect all electrical power and shut off the gas supply at the service valve before beginning any service or installation work. The unit requires a properly sized rooftop curb or concrete slab pad rated for the equipment weight, and gas supply piping must be sized and tested per local code before startup. Do not operate the unit without verifying correct electrical phasing and confirming that all gas connections are leak-tested.
Thanks for subscribing!
This email has been registered!