

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 60 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE TWE07244BACP01L is a commercial-grade air handler rated at 6 tons and designed for 460-volt, 3-phase electrical service. Air handlers of this class circulate conditioned air through a duct system by housing the evaporator coil, blower assembly, and related components in a single cabinet. This unit pairs with a matched condensing unit or chiller to complete a split-system installation. Licensed HVAC technicians install and commission units of this type in light commercial and large residential applications where higher-capacity airflow and three-phase power are available.
This air handler is suited for commercial and large-scale residential installations requiring 6 tons of cooling capacity. Three-phase 460-volt power supply makes it appropriate for facilities such as office buildings, retail spaces, light industrial spaces, and multi-unit residential properties where three-phase electrical service is already in place. The unit is designed to integrate into a ducted forced-air system and operates as part of a split or packaged HVAC configuration under the supervision of a licensed mechanical contractor.
Designed as an OEM-style replacement or new-installation air handler for commercial split-system HVAC configurations requiring 6-ton capacity at 460-volt, 3-phase power. Consult TRANE equipment documentation to confirm matched condensing unit compatibility before installation.
Installation must be performed by a licensed HVAC technician familiar with commercial air handler work and applicable mechanical and electrical codes. Disconnect and lock out all electrical power at the disconnect box before beginning any service or installation work. Three-phase wiring connections must comply with NEC requirements and be verified for correct phase rotation before startup. Do not operate the unit without confirming that refrigerant line sets, condensate drain, and ductwork connections are complete and properly sealed.
Thanks for subscribing!
This email has been registered!