

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE THJ090A4S0C0YT1 is a commercial packaged cooling unit rated at 7.5 tons and designed for 460-volt, 3-phase electrical service. Packaged rooftop units of this class integrate the refrigeration circuit, evaporator, condenser, and air-handling components into a single cabinet, simplifying installation and reducing the number of field connections. The THJ series is built for commercial applications where a self-contained cooling solution is required and three-phase power is available. Installation and commissioning are typically performed by licensed HVAC-R technicians familiar with commercial rooftop equipment.
This unit is suited for light commercial and commercial rooftop installations where a dedicated packaged cooling system is required. At 7.5 tons, it covers mid-range commercial spaces such as retail units, small office buildings, and light industrial facilities. The 460-volt, 3-phase electrical configuration is standard for commercial construction and is consistent with typical code requirements for equipment of this capacity. Applications requiring single-phase or residential-voltage supply are outside the scope of this unit.
Designed as an OEM packaged cooling unit within the TRANE THJ commercial rooftop product line. Consult TRANE engineering documentation and the unit nameplate to confirm curb dimensions, duct connection size, and electrical requirements before installation.
Installation must be performed by a licensed HVAC-R technician in accordance with local mechanical codes, NEC requirements for commercial equipment, and the manufacturer's installation instructions. Disconnect and lock out all electrical power at the supply disconnect before any service work. Verify that the structural rooftop curb is rated for the unit weight and that duct connections are sealed and secured per local code. Do not operate the unit without confirming refrigerant charge, electrical phasing, and control wiring are correct.
Thanks for subscribing!
This email has been registered!