

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 700 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE ECC120A3E0B3YXA is a commercial cooling unit rated at 10 tons and designed for operation on 208/230-volt, 3-phase power. It delivers high-capacity cooling output suited to demanding commercial and light-industrial environments. The 3-phase electrical configuration indicates this unit is intended for commercial service locations with proper power infrastructure. Licensed HVAC technicians and commercial refrigeration contractors are the primary installers of this equipment. The 10-ton capacity places this unit in a range commonly used for medium to large commercial spaces requiring significant sensible and latent cooling performance.
This unit is applicable to commercial cooling installations where 3-phase power is available. Typical deployment scenarios include rooftop or ground-level mechanical installations serving retail, office, light-manufacturing, or similar occupancies. The 208/230-volt, 3-phase supply requirement means the installation site must have compatible electrical infrastructure before commissioning. This is a cooling-only configuration and is not intended for heat-pump or heating applications.
Designed as an OEM commercial cooling unit for 3-phase electrical systems operating at 208/230 volts. No specific compatible system models or replacement part numbers were provided in the available product data.
Installation must be performed by a licensed HVAC contractor familiar with commercial refrigeration systems and 3-phase electrical service. Disconnect and lock out all electrical power before servicing any electrical components. Refrigerant handling requires EPA Section 608 certification. Follow all applicable local mechanical and electrical codes, including NEC requirements for disconnect sizing and equipment grounding, before energizing the unit.
Thanks for subscribing!
This email has been registered!