Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The ORTRONICS PW5ER100DB-06 is a solid conductor riser-rated cord designed for in-wall and between-floor cable runs in commercial and residential structured wiring installations. Riser ratings meet vertical flame-spread requirements, making this cable suitable for use in building risers and vertical shaft runs where plenum-rated cable is not required. At 100 feet, the spool provides enough length for most single-run vertical installations without splicing. The blue jacket aids in color-coded cable management and circuit identification in patch panels and wiring closets. This type of cable is typically pulled and terminated by low-voltage technicians or licensed data/telecom cabling installers.
This solid conductor riser cord is intended for permanent, fixed structured cabling installations in office buildings, multi-unit residential buildings, and light commercial facilities. Solid conductor construction makes it appropriate for punch-down terminations at keystone jacks, patch panels, and 110-style blocks. The 100-foot length suits floor-to-floor or equipment-room-to-work-area runs. The blue jacket color supports standard TIA-606 color-coding practices for network infrastructure identification.
Designed as an OEM-style solid conductor riser cable for use with standard 110-punch-down keystone jacks, patch panels, and structured wiring hardware in low-voltage data and telecom installations.
Installation should be performed by a qualified low-voltage cabling technician in accordance with NEC Article 800 requirements for communications riser cables. De-energize any adjacent electrical circuits before pulling cable through walls or vertical shafts. Use a 110 punch-down tool for terminations at keystone jacks and patch panels — do not use stranded-cable termination methods on solid conductor wire. Secure cables at appropriate intervals per local building and fire codes to maintain the integrity of the riser pathway.
Thanks for subscribing!
This email has been registered!