

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 2200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET EQUIPMENT JT9-894357 is the EVS-949 Elite vertical knee mill, fully configured with a 2-axis Newall DP700 digital readout, XYZ-axis powerfeeds, and a powered draw bar. This machine is built around a precision-scraped spindle assembly, with ways hand-scraped to a minimum of 16 points per inch to meet strict tolerancing demands. The result is a rigid, repeatable platform suited for production milling, tool-and-die work, and precision part fabrication. It arrives as a complete, ready-to-run package for machine shops and industrial facilities that need a capable knee mill without sourcing accessories separately.
The EVS-949 configuration is intended for commercial and industrial machine shop environments. The integrated Newall DP700 DRO provides real-time axis position feedback, reducing setup time and improving part accuracy. The XYZ powerfeeds reduce operator fatigue during extended feed operations. The powered draw bar accelerates tool changes at the spindle. This package suits job shops, vocational training facilities, and production floors running ferrous and non-ferrous materials requiring consistent milling tolerances.
Configured specifically for the JET EVS-949 Elite vertical knee mill platform as a complete factory-bundled package including DRO, powerfeeds, and powered draw bar.
Installation and commissioning of a vertical knee mill of this size and weight requires qualified millwrights or machine tool technicians. At 2200 pounds, proper rigging equipment and a level, reinforced concrete floor pad are required before positioning. Electrical connection must comply with applicable NEC requirements for the machine voltage and amperage rating and should be performed by a licensed electrician. All axis locks and spindle safety guard must be verified functional before initial power-on.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!