

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 2580 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET EQUIPMENT JT9-690644 is a 10-inch by 50-inch electronic variable speed vertical milling machine built for demanding production and job-shop environments. Constructed using the Meehanite casting process with enhanced internal ribbing, the machine delivers rigidity and tolerance retention across heavy cutting cycles. Spindle speed runs continuously variable from 60 to 4500 RPM, eliminating belt changes during setup. The package includes a Newall DP700 digital readout configured for 3-axis operation with a quill-mode display and an X-axis powerfeed. Licensed HVAC and mechanical trades as well as production machinists will find this machine suited to precision milling, drilling, and boring work.
The JT9-690644 is designed for installation in machine shops, maintenance departments, and light industrial facilities requiring a full-size knee mill with integrated DRO capability. The Newall DP700 DRO supports quill operation directly, making it well suited to tool-and-die work and general production milling. The X-axis powerfeed reduces operator fatigue during long table traversals. The machine ships as a complete unit with chip pan, LED work lamp, swing-away safety shield, drawbar, way covers, and a toolbox with tools included.
The JT9-690644 is the JTM-1050EVS2/230 mill configured with the Newall DP700 3-axis DRO (quill mode) and X-axis powerfeed. Accessories and tooling using an R-8 spindle taper are compatible with this machine.
Installation should be performed by qualified millwrights or industrial equipment technicians. The redesigned base allows the machine to be leveled without lifting it off the floor, but adequate fork or crane capacity rated for the machine weight is required for placement. Verify that the facility electrical supply matches the 230-volt single-phase requirement before connecting power. All guarding, including the swing-away safety shield, must be in place and the E-stop verified functional before initial operation.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!