

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 668 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The GLOBAL INDUSTRIAL B3241976 is a six-unit high-density floor track wire shelving system built for commercial and industrial storage environments. Each stainless steel wire shelving unit measures 48 inches wide by 24 inches deep by 76 inches high and rides on a 15-foot V-groove floor track with industrial-grade bearings. Units glide laterally with minimal effort, eliminating fixed aisles and increasing usable storage capacity by up to 150 percent compared to static shelving layouts. Each unit supports up to 1,500 pounds, and shelves reposition in 1-inch increments to accommodate changing inventory. The system carries NSF certification and is ADA compliant for safe use in commercial food service, healthcare, and institutional facilities.
This system is designed for facilities where maximizing floor space is a priority without sacrificing access to stored inventory. Typical applications include commercial kitchens, food processing operations, hospital supply rooms, pharmaceutical storage, and high-density warehouse environments. The open wire construction promotes airflow and visibility throughout the stored load. Licensed contractors, facility maintenance personnel, and food service equipment installers are the primary trades responsible for setup and deployment of this system.
Designed as an OEM-style high-density floor track shelving system intended for commercial and institutional storage installations requiring NSF-certified stainless steel wire shelving.
Installation is typically performed by facility maintenance crews or commercial shelving contractors. Before assembly, verify that the floor surface is level and capable of supporting the combined live load of all six units. The floor track must be anchored according to the manufacturer instructions and applicable local building codes. Power down or isolate any adjacent electrical panels or refrigeration units in the work area before beginning track installation to maintain a safe work zone.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!