

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 148 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The GLOBAL INDUSTRIAL 239115PBK is a mobile, battery-powered LCD computer cabinet designed to serve as a secure, self-contained workstation in demanding environments. Built around a 1280 Wh lithium iron phosphate battery, it delivers 8 or more hours of runtime with 1000 watts of continuous output power and 2000 watts of surge capacity. Five electrical outlets and two USB ports are integrated into a built-in power strip. The steel enclosure features a powder coat finish and rides on four industrial swivel casters, two of which include brakes for stationary locking. This unit ships unassembled and is targeted at facilities managers, IT staff, and operations personnel who need a portable, lockable workstation with onboard power.
This cabinet is suited for construction sites, manufacturing floors, libraries, and retail environments where PCI compliance or physical security of computer equipment is a priority. The locking monitor compartment accommodates LCD flat panel monitors up to 24 inches diagonal and includes a break-resistant window framed in heavy-duty steel. The window panel is removable for touch screen access. A sloped writing surface, two paper organizers for 8.5 inch by 11 inch documents, a locking slide-out keyboard drawer, and front and rear doors on the lower compartment make this a complete workstation enclosure. Louvered rear panels support heat regulation, and cable management openings are located throughout the cabinet.
Designed to accommodate LCD flat panel monitors up to 24 inches diagonal. Optional accessories sold separately include a side shelf kit (Item 237368BK) and a sliding mouse tray (Item 273113).
Assembly is required before use. Follow the included instructions and ensure all structural fasteners are fully seated before loading equipment. Verify that the battery is fully charged prior to first deployment and that the operating environment remains between 32 and 95 degrees F. Engage caster brakes on both locking wheels before placing the unit in a fixed workstation position to prevent unintended movement.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!