

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The GIBRALTAR LP2-C6H-G is a studded pivotal stud mount leveling pad designed for industrial and commercial equipment stabilization and leveling applications. The part features a 5/8-11 bolt thread for secure, vibration-resistant mounting and a 2.5-inch base diameter that distributes load across the contact surface. With a rated load capacity of 5,000 pounds, this leveling pad handles heavy machinery, fabrication equipment, and large mechanical systems. The pivotal design allows the foot to self-adjust to uneven floor surfaces, maintaining consistent contact and reducing stress on the mounting thread. Weighing 1.03 pounds, it is compact enough for tight installations while delivering industrial-grade load performance. Licensed mechanical and millwright contractors most commonly install this hardware during equipment commissioning or repositioning.
This leveling pad is suited for use in manufacturing facilities, mechanical rooms, and industrial shop floors where equipment must be precisely leveled and anchored. Common applications include compressors, pumps, presses, generators, and large HVAC equipment that require a rigid, adjustable floor mount. The 5/8-11 thread size is a standard coarse-thread fastener size widely used in heavy equipment bases, making this pad a direct fit for many existing threaded foot assemblies. The 7.8125-inch overall length provides ample adjustment range for varying floor conditions and equipment clearance requirements.
Designed as a direct-fit leveling pad for equipment bases, machinery frames, and mounting structures that accept a 5/8-11 threaded foot stud. Suitable for any application requiring a heavy-duty pivotal leveling mount at this thread size.
Installation is typically performed by millwrights, mechanical contractors, or equipment service technicians. De-energize and lock out all equipment before adjusting or replacing leveling hardware. Thread the stud fully into the equipment base and use an appropriately sized wrench or socket to set the desired height before tightening any jam nut to lock position. Verify that the floor surface is capable of supporting the rated load at the contact point before placing equipment in service.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!