

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The GENESIS CABLE 32025512 is a 22 AWG, 2-conductor stranded shielded security cable rated CL2P for plenum-space installation. It is designed for low-voltage security, alarm, and access control wiring in commercial and residential buildings where cables must run through air-handling spaces. The stranded conductors provide flexibility during pull-through, while the overall shield reduces electromagnetic interference on signal circuits. The CL2P rating satisfies code requirements for plenum-rated installations without the need for conduit in those spaces. The beige jacket blends with standard ceiling and wall finishes. This cable is installed by licensed alarm technicians, low-voltage contractors, and security system integrators.
This cable is suited for fire alarm notification circuits, intrusion detection wiring, access control panel runs, and intercom or call-system connections that pass through plenum air-handling spaces. It is appropriate for both new construction and retrofit projects in office buildings, schools, hospitals, and multi-family residential structures where code mandates plenum-rated cable in HVAC air-return pathways. The 500-foot box format supports longer continuous runs typical of commercial security installations.
Designed as a standard CL2P-rated 22 AWG 2-conductor stranded shielded cable suitable for low-voltage security, alarm, and access control system wiring in plenum air-handling spaces per NEC Article 800 and related code sections.
Installation should be performed by a licensed low-voltage or alarm contractor in accordance with NFPA 72, NEC Article 760, and applicable local codes. De-energize all connected panels and control equipment before making terminations. Do not exceed the cable's minimum bend radius during routing, and avoid bundling with high-voltage conductors that could induce interference. Verify that all plenum-space pathways are confirmed air-handling zones before substituting a non-plenum cable type.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!