

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 55 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The COPELAND ZPD42K5ETF5 is a digital scroll compressor rated at 43,000 BTU/h and 3.5 horsepower, designed for commercial and residential refrigeration and air conditioning systems operating on R-410A refrigerant. It runs on a 200-230V, three-phase power supply, making it suited for light commercial split systems and packaged equipment where variable capacity control is required. Digital scroll technology modulates capacity by alternating between loaded and unloaded states, improving part-load efficiency and reducing energy consumption compared to fixed-scroll designs. Licensed HVAC technicians handle installation and commissioning of this compressor.
The ZPD42K5ETF5 is applied in commercial cooling systems where demand varies significantly across operating hours. Digital scroll compressors are commonly installed in variable-capacity rooftop units, precision cooling equipment, and split-system condensing units. The three-phase electrical configuration suits commercial building applications and light industrial environments where three-phase power is available at the equipment disconnect. This compressor is not intended for single-phase residential equipment.
Designed as an OEM-style replacement or new-installation digital scroll compressor for three-phase R-410A commercial air conditioning and refrigeration systems rated near 3.5 HP and 43,000 BTU/h.
Installation must be performed by a licensed HVAC technician holding the appropriate EPA Section 608 certification for handling R-410A refrigerant. Disconnect and lock out all electrical power and relieve system pressure before removing the existing compressor. Verify oil type and charge quantity are appropriate for the ZPD42K5ETF5 before commissioning. Follow the equipment manufacturer's wiring diagram and all applicable local mechanical and electrical codes during installation.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!