

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 500 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The APC GVSUPS80KRGS is an 80-kilowatt, 480-volt uninterruptible power supply in the Galaxy VS series, designed to protect critical enterprise loads from power disturbances including outages, sags, surges, and noise. It delivers clean, conditioned output power to sensitive data center, industrial, and commercial infrastructure equipment. Licensed electricians and power systems engineers handle installation and commissioning. The unit is sold individually and is intended for facilities with three-phase 480V electrical infrastructure that require high-availability power protection at the 80 kW capacity tier.
The GVSUPS80KRGS fits enterprise environments where continuous uptime is mandatory, including data centers, network closets, industrial process controls, and critical commercial facilities. It belongs to the Galaxy VS product family, which targets mid-to-large scale power protection applications. Facilities managers and electrical contractors typically specify this unit during new construction or infrastructure upgrades where load requirements demand an 80 kW UPS operating on a 480-volt three-phase supply.
Designed as an enterprise-class uninterruptible power supply for three-phase 480V electrical systems in data center, industrial, and large commercial facility applications.
Installation must be performed by a licensed electrician in accordance with NFPA 70 (NEC) and all applicable local codes. Disconnect and lock out all upstream power sources before making any electrical connections. Verify that the facility switchgear and feeder conductors are rated for the input current draw of an 80 kW UPS at 480V before energizing. Commissioning of enterprise UPS systems typically requires coordination with the facility electrical engineer and may involve load-bank testing prior to placing critical loads on the unit.
Thanks for subscribing!
This email has been registered!