

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The VLIER P304S is a studded pivotal leveling mount designed to provide stable, adjustable support for machinery, equipment frames, and industrial installations. The pivotal pad design allows the base to articulate and self-align on uneven or sloped surfaces, maintaining full contact under load. Built from steel construction throughout, the P304S features a 3/8-16 threaded stud and supports a load capacity of 3,750 pounds. The 1-1/4 inch base diameter and 2-7/8 inch length suit installations where compact footprint and high load-bearing capability are both required. This mount is installed by millwrights, maintenance technicians, and equipment installers across manufacturing and industrial facilities.
The P304S is suited for leveling and anchoring production equipment, conveyors, machine tools, workstations, and similar industrial machinery. The pivotal action of the base pad compensates for floor irregularities without requiring a perfectly flat mounting surface. The 3/8-16 thread size is compatible with standard machine framing and equipment bases, making it a straightforward replacement or new-installation component in a wide range of industrial settings. Its all-steel construction holds up under demanding shop-floor and production-line conditions.
Designed as an OEM-style replacement or new-installation leveling mount for industrial machinery, equipment frames, and production line assemblies using 3/8-16 threaded mounting points.
Installation is typically performed by millwrights or maintenance technicians during equipment setup or re-leveling service. Ensure the equipment is de-energized and safely supported before removing or installing leveling mounts. Use appropriate wrenches for the 3/8-16 thread and verify that the mounting hole or nut plate is clean and free of debris before threading in the stud. After installation, confirm that the pivotal pad seats fully on the floor surface and that the equipment frame is level before returning the unit to service.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!