

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The VALUE COLLECTION 805-025C is a Schedule 80 CPVC thermoplastic pipe tee designed for demanding pressure piping systems. Sized at 2.5 inches, it features female iron pipe thread (FIPT) connections on all three ports, allowing direct threaded assembly without solvent welding at the joint. CPVC construction provides resistance to corrosion, scaling, and a broad range of industrial chemicals, making it suitable for hot and cold water distribution, chemical transfer lines, and industrial process piping. Licensed plumbers and pipefitters install this fitting as part of Schedule 80 systems where higher pressure ratings and greater wall thickness are required compared to Schedule 40.
This tee is used in residential and commercial plumbing systems, industrial fluid handling, and process piping applications that call for Schedule 80 CPVC fittings. The FIPT x FIPT x FIPT end configuration suits installations where threaded connections are preferred or required by the existing pipe layout. It is a standard branch tee, splitting or combining flow at a 90-degree lateral from the run. Typical install scenarios include hot water recirculation systems, chemical feed lines, and high-pressure domestic water distribution.
Designed as an OEM-style replacement or new-installation fitting for Schedule 80 CPVC threaded piping systems using 2.5-inch nominal pipe size.
Installation should be performed by a licensed plumber or pipefitter in accordance with applicable local plumbing codes and ASTM standards for CPVC piping systems. Shut off and depressurize the water or process line completely before cutting in or replacing any fitting. Use CPVC-compatible thread sealant tape or compound on all FIPT connections and tighten to manufacturer-recommended hand-plus-wrench turns without over-torquing, as CPVC threads can crack under excessive force. Confirm that the system fluid, temperature, and pressure ratings are within the published limits for Schedule 80 CPVC before returning the line to service.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!