

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE YHC047E4RXA005D is a packaged gas-electric rooftop unit designed for commercial HVAC applications. This gas pack combines gas heating and electric cooling into a single self-contained cabinet, simplifying installation and reducing rooftop mechanical footprint. Rated at 4 tons of cooling capacity and built for 460-volt, 3-phase power, this unit is specified for light commercial and commercial buildings where three-phase power is available. Licensed commercial HVAC technicians and mechanical contractors handle installation and commissioning of this equipment.
This unit is suited for light commercial rooftop applications including retail spaces, office buildings, and similar structures requiring a single packaged solution for both heating and cooling. The 460-volt, 3-phase electrical configuration makes it appropriate for commercial construction where three-phase power distribution is standard. The packaged design integrates the gas furnace section and the refrigeration circuit into one factory-assembled cabinet, reducing field assembly time and the number of refrigerant connections made on site.
Designed as an OEM rooftop packaged gas-electric unit for commercial HVAC installations requiring 460-volt, 3-phase power at 4 tons of cooling capacity. Consult equipment schedules and engineering submittals to confirm curb compatibility and ductwork connections before ordering.
Installation must be performed by a licensed commercial HVAC contractor in accordance with applicable mechanical codes including the International Mechanical Code and the International Fuel Gas Code. Disconnect and lock out all electrical power and close the gas supply valve before servicing any components. Roof curb selection, structural load ratings, and flue venting must be verified prior to installation. Refrigerant work requires EPA Section 608 certification.
Thanks for subscribing!
This email has been registered!