

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE TSC048G4E0A005D is a packaged rooftop unit (RTU) combining gas heat and electric cooling in a single factory-assembled cabinet. Rated at 4 tons of cooling capacity and designed for 460-volt, 3-phase power, this unit is built for commercial light commercial and small commercial building applications. The TSC series features a convertible airflow configuration, giving installing contractors flexibility in duct connection orientation. Licensed commercial HVAC technicians are the primary installers and service personnel for this equipment.
The TSC048G4E0A005D is intended for rooftop-mounted installation on commercial structures such as retail buildings, office suites, and similar light commercial occupancies. Its gas heat and electric cooling configuration makes it a standard choice where natural gas is available and single-package simplicity is preferred over split-system designs. The 460-volt 3-phase electrical supply requirement is typical of commercial construction with three-phase service panels.
Designed as an OEM packaged rooftop unit for commercial HVAC applications requiring 4-ton cooling capacity with 460-volt 3-phase power and gas heat.
Installation must be performed by a licensed commercial HVAC contractor in accordance with local mechanical codes and the applicable sections of the International Mechanical Code (IMC) and International Fuel Gas Code (IFGC). Disconnect and lock out all electrical power at the distribution panel before servicing. Gas supply must be shut off at the service valve before any work on the heat section. Rooftop curb alignment and duct connection should be completed prior to setting the unit.
Thanks for subscribing!
This email has been registered!