

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE GCC102A3EMB3YXA is a commercial gas-pack unit designed for packaged rooftop or ground-level installations where heating and cooling are handled by a single self-contained cabinet. Running on 208/230V three-phase power and rated at 8.5 tons of cooling capacity, this unit is built for light commercial applications that demand reliable year-round climate control. Gas-pack configurations combine a gas-fired heating section with a direct-expansion cooling circuit in one cabinet, reducing the need for separate indoor air handling equipment. Installation is performed by licensed HVAC mechanics familiar with commercial packaged equipment.
This unit is suited for light commercial buildings, retail spaces, schools, and similar applications where rooftop or slab-mounted packaged equipment is the design standard. The 8.5-ton capacity targets mid-size zones that fall between standard residential tonnage and larger commercial rooftop unit classes. Three-phase electrical service is required, making this unit appropriate for commercial structures with existing 208/230V three-phase distribution. Contractors specifying or replacing packaged gas-electric rooftop equipment in this tonnage class should confirm electrical service compatibility before ordering.
Designed as an OEM packaged gas-electric unit for light commercial rooftop or ground-mounted applications requiring 8.5 tons of cooling and three-phase electrical service. No specific replacement or cross-reference part numbers were provided in the available product data.
Installation must be performed by a licensed commercial HVAC contractor in accordance with local mechanical codes, the IFGC, and NEC requirements for three-phase equipment. Confirm that the site electrical service provides 208/230V three-phase capacity before connecting. Shut off all electrical power at the disconnect and close the gas supply valve before servicing any component inside the cabinet. Rooftop installations require a properly rated curb adapter and must comply with local building and structural requirements.
Thanks for subscribing!
This email has been registered!