

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This is a Final Sale item and cannot be returned or refunded. Exceptions apply for damaged or defective items.
This product weighs 200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Expert Advice
Fast Shipping
The TRANE GCC090A4EHB3YXA is a commercial gas/electric packaged rooftop unit (RTU) rated at 7.5 tons and 180,000 BTU/h with a 14 SEER efficiency rating. It operates on 460-volt, 3-phase power, placing it squarely in the light commercial segment. This unit integrates both gas heating and electric cooling into a single rooftop package, eliminating the need for a separate air handler or furnace. It is specified and installed by commercial HVAC contractors on low-slope rooftops in applications requiring self-contained climate control.
The GCC090A4EHB3YXA is designed for light commercial buildings where rooftop installation is standard practice. Typical applications include retail spaces, office suites, and small industrial facilities that require a single packaged system to handle both heating and cooling loads. The 460-volt, 3-phase electrical configuration is consistent with commercial building infrastructure, and the gas-heat section provides reliable heating capacity without a separate heating system. Licensed commercial HVAC technicians handle sizing, installation, and commissioning of this unit type.
Designed as an OEM commercial gas/electric packaged rooftop unit for light commercial applications requiring 460-volt, 3-phase power and 7.5-ton cooling capacity.
Installation must be performed by a licensed commercial HVAC contractor in accordance with local mechanical codes, NEC requirements, and the manufacturer's installation instructions. Disconnect and lock out all electrical power at the disconnect switch before performing any service or wiring work. Gas supply connections must comply with IFGC requirements and be leak-tested before startup. Verify that the structural rooftop curb is rated for the unit's operating weight before placement.
Thanks for subscribing!
This email has been registered!