

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The PRO-SAFE PSG1760P is a pedestal-mount eye and face wash station designed for emergency decontamination in industrial, commercial, and laboratory environments. The unit features an open plastic bowl and delivers a controlled flow rate of 3 GPM at 30 psi, meeting the fluid delivery requirements for effective eye and face flushing. It accepts a 0.5-inch inlet connection, making integration into standard plumbing supply lines straightforward. The station is built to ANSI Z358.1-2004 standards, the governing specification for emergency eyewash and face wash equipment. Installation and commissioning are typically handled by licensed plumbers or facilities maintenance professionals.
This eye and face wash station is suited for workplaces where workers may be exposed to hazardous chemicals, particulates, or biological agents. Pedestal mounting makes it a self-contained unit that can be positioned anywhere a dedicated 0.5-inch water supply line can be run, without requiring a countertop or wall structure for support. Typical installations include manufacturing plants, chemical processing facilities, laboratories, janitorial service areas, and similar environments where OSHA and ANSI emergency equipment placement requirements apply.
Designed as a freestanding pedestal-mount emergency eye and face wash station compatible with standard 0.5-inch plumbing supply lines in industrial, commercial, and laboratory installations requiring ANSI Z358.1-2004 compliance.
Installation should be performed by a licensed plumber in accordance with applicable local plumbing codes and ANSI Z358.1-2004 placement guidelines, which specify required travel distance and accessibility from hazard areas. Shut off the water supply before making inlet connections and verify that supply pressure does not exceed the rated 30 psi operating pressure at the station. Flush the supply line thoroughly before final connection to remove debris that could affect flow performance. After installation, activate the station and verify flow rate and pattern before returning the area to service.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!