

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The POTTER ELECTRIC SIGNAL CO. US AFC-1000E is an expandable addressable fire alarm control panel (FACP) designed for large-scale fire detection and notification systems. Built to support up to 1270 addressable points, this panel provides broad coverage for complex facilities requiring flexible, scalable fire protection. Licensed fire alarm technicians and systems integrators install this panel in commercial, institutional, or industrial settings where addressable loop architecture and high device capacity are required. The AFC-1000E serves as the central intelligence hub for connected detectors, modules, and notification appliances across an addressable fire alarm system.
The AFC-1000E is suited for commercial and institutional fire alarm installations where a high point count and system expandability are essential. Typical applications include multi-tenant buildings, large campuses, healthcare facilities, and other occupancies that require scalable fire alarm infrastructure. This panel fits into addressable fire alarm system architectures where individual device identification and status reporting are required at the panel level. Installation is performed by licensed fire alarm contractors in compliance with NFPA 72 and local authority having jurisdiction requirements.
Designed as an OEM-style addressable fire alarm control panel for large commercial and institutional fire alarm systems requiring expandable, high-capacity addressable point architecture.
Installation must be performed by a licensed fire alarm technician or contractor in accordance with NFPA 72 and all applicable local codes. Disconnect and lock out all power sources to the fire alarm system before servicing or wiring the panel. Follow the manufacturer wiring diagrams and programming documentation precisely, as incorrect loop wiring or address assignment can prevent proper system operation. Final acceptance testing and commissioning must be completed in coordination with the local authority having jurisdiction.
Thanks for subscribing!
This email has been registered!