



Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The OATEY 38707 is a blue pipe guard sleeving designed to protect plastic and copper piping embedded in concrete. At 200 feet per roll, it provides substantial coverage for slab construction projects where supply lines must be set into concrete before the pour. The blue color coding identifies it as a cold water application, making it easy to distinguish from red-coded hot water sleeving on the job site. Plumbers and contractors install it by sleeving it over the pipe prior to encasement in concrete, shielding the pipe from direct contact with the slab material.
Pipe guard sleeving is a standard requirement in concrete slab construction, particularly for residential and light commercial plumbing rough-ins where supply piping is run horizontally through the foundation. The OATEY 38707 accommodates 1/2 inch, 3/4 inch, and 1 inch piping, covering the most common residential and commercial supply line sizes. The product ships in a self-dispensing box, allowing the sleeving to feed cleanly during installation without tangling or unspooling on the slab.
Compatible with 1/2 inch, 3/4 inch, and 1 inch plastic and copper piping. Designed as an OEM-style sleeving solution for concrete slab plumbing construction.
Installation is performed by licensed plumbers during the rough-in phase, before the concrete slab is poured. Sleeve the pipe guard over the pipe run prior to placement in the form to ensure full coverage through the concrete zone. Follow local plumbing codes and IPC requirements for pipe protection in concrete slabs. Do not install over pipe fittings or joints without confirming local code allowances for embedded connections.
Thanks for subscribing!
This email has been registered!

