

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The NIBCO CE01250 is a 90-degree elbow fitting made from PVDF (polyvinylidene fluoride), a high-purity thermoplastic suited for aggressive chemical, high-purity, and industrial piping systems. This fitting is manufactured to Schedule 80 wall thickness and features Slip x SR FIPT (solvent socket by straight reinforced female iron pipe thread) end connections in a 1/2 inch size. PVDF offers strong resistance to a wide range of acids, bases, and solvents, making it a common choice where standard PVC or CPVC would degrade. It meets ASTM D3222 material standards. Plumbers and pipefitters working in chemical processing, semiconductor fabrication, water treatment, or high-purity fluid handling systems typically install this fitting.
This fitting is intended for 1/2 inch Schedule 80 PVDF piping systems where a 90-degree directional change is required. The Slip x SR FIPT connection accommodates a solvent-welded socket on one end and a threaded female connection on the other, allowing integration with both solvent-cemented PVDF pipe runs and threaded components. It is suited for both industrial and commercial applications where chemical resistance, purity, and pressure-rated Schedule 80 construction are required. No specific model or system compatibility data was provided beyond the listed specifications.
Designed as an OEM-style replacement or new-installation fitting for 1/2 inch Schedule 80 PVDF piping systems with Slip x SR FIPT end connections.
Installation should be performed by a licensed plumber or pipefitter familiar with thermoplastic piping systems and solvent-cementing procedures for PVDF. Depressurize and drain the piping system fully before cutting into an existing line. Use only PVDF-compatible solvent cement on the slip end and verify thread sealant compatibility with the fluid media before making up the threaded connection. Follow applicable plumbing codes, including IPC provisions for plastic piping, and observe manufacturer cure times before returning the system to pressure.
Thanks for subscribing!
This email has been registered!