NIBCO Nibco CC00150 Socket Coupling 1-1/2 in Sch 80 Polypropylene

Nibco CC00150 Socket Coupling 1-1/2 in Sch 80 Polypropylene

NIBCO
Brand: NIBCO
SKU: CC00150
Availability: In Stock

Ships same day if ordered by 12 pm

$53.13
$53.13
HAVE A QUESTION?

Our team is ready to help!

  • Voomi Supply

    Secure Payments

  • Voomi Supply

    Easy Returns

  • Voomi Supply

    Expert Advice

  • Voomi Supply

    Fast Shipping

Product Description

The NIBCO CC00150 is a Schedule 80 polypropylene socket coupling designed for joining 1-1/2 inch plastic pipe runs in demanding industrial and commercial piping systems. Made from black polypropylene, this fitting handles elevated temperatures up to 180 degrees F, making it suitable for hot-process fluid lines, chemical handling, and industrial drainage applications. The slip-by-slip end connections allow for solvent-welded assembly with standard polypropylene pipe. Plumbers and pipefitters working with thermoplastic systems specify this coupling where corrosion resistance, chemical compatibility, and thermal tolerance are required.

This coupling is well suited for Schedule 80 polypropylene piping systems found in industrial facilities, manufacturing plants, chemical processing environments, and commercial plumbing installations. The 1-1/2 inch size fits a common branch and main line dimension in process piping. It is also applicable in irrigation and water treatment system builds where thermoplastic fittings are preferred over metal. Both end connections are slip-style, accepting pipe that is cut, deburred, and prepared for solvent cementing per standard practice.

Key Features

  • Schedule 80 wall thickness for higher pressure and temperature service
  • Polypropylene construction resists corrosion and a broad range of chemicals
  • Maximum working temperature of 180 degrees F
  • Slip x Slip end connections for solvent-welded assembly
  • Meets ASTM D4101 standard for polypropylene plastic pipe fittings
  • Black color polypropylene for UV and chemical resistance

Compatibility

Designed as an OEM-style replacement and standard fitting for Schedule 80 polypropylene piping systems using 1-1/2 inch slip-connect pipe.

Installation Notes

Installation should be performed by a licensed plumber or qualified pipefitter familiar with thermoplastic solvent-weld procedures. Shut off fluid supply and depressurize the line completely before cutting into an existing system. Pipe ends must be cut square, deburred, and cleaned before applying the appropriate polypropylene solvent cement. Follow IPC and local plumbing code requirements for thermoplastic piping in the applicable service environment.

Technical Specifications
Fitting Type
Socket Coupling
Fitting Size
1-1/2 inches
Material
Polypropylene
Color
Black
End Connection
Slip x Slip
Schedule
80
Maximum Working Temperature
180 degrees F
Standard
ASTM D4101
Weight
0.22 pounds
Brand
NIBCO
Manufacturer Part Number
CC00150
NIBCO Nibco CC00150 Socket Coupling 1-1/2 in Sch 80 Polypropylene

Vendor: NIBCO

Nibco CC00150 Socket Coupling 1-1/2 in Sch 80 Polypropylene

$53.13

Vendor: NIBCO

Nibco CC00150 Socket Coupling 1-1/2 in Sch 80 Polypropylene

$53.13

Related Products

Customer Support Image

Need Support?

Call Jack and His Team