

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 400 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET-LUBE 93129 is an arctic-grade gate and plug valve sealant formulated for pipeline and compressor station service where light hydrocarbon liquids and gases are present. The compound remains pumpable down to -58 degrees F when used with an appropriate pump, making it suitable for extreme cold-weather field conditions. It reduces the torque required for smooth valve operation and protects internal plug surfaces against scoring and galling. Supplied in a 400 lb lined drum, this sealant is intended for installation and maintenance by pipeline technicians and industrial valve service professionals.
EZY-TURN 3 ARCTIC is designed for use in pipeline transmission and compressor station environments where hydrocarbon gases and light liquid hydrocarbons are handled. Typical applications include lubricated plug valves and gate valves in above-ground and buried service where low ambient temperatures demand a sealant that remains workable and does not harden or separate. The lined drum packaging is suited for bulk dispensing with compatible pumping equipment at job sites or maintenance facilities.
Designed as a sealant for lubricated gate and plug valves used in pipeline and compressor station service where light hydrocarbon liquids and gases are present.
Application is performed by qualified pipeline or valve service technicians using compatible valve injection or pumpable sealant equipment rated for the product viscosity at operating temperature. Isolate and depressurize the valve assembly before injecting sealant in accordance with applicable facility procedures and relevant codes. Use only pump equipment rated for arctic-grade compounds to ensure proper delivery at low temperatures. Follow all site safety and hydrocarbon handling procedures when working around pressurized pipeline systems.
Thanks for subscribing!
This email has been registered!