

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 2900 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET 691205 is a full-size vertical knee mill configured with a Newall C80 digital readout (DRO) and an X-axis powerfeed pre-installed at the factory. The machine is built for precision metalworking in job shops, tool rooms, and industrial maintenance departments. The Newall C80 DRO provides accurate real-time axis position data, reducing setup time and improving repeatability on milling, drilling, and boring operations. The X-axis powerfeed automates table travel, reducing operator fatigue on long cuts and improving feed consistency. At 2,900 pounds, this is a production-grade machine requiring proper rigging and a prepared foundation before installation.
The JET 691205 is intended for professional machine shop environments handling ferrous and non-ferrous metals. Typical applications include face milling, end milling, slot cutting, drilling, and boring. This configuration is suited for tool-and-die work, maintenance machining, and short-run production where both manual control and powered table travel are required. The factory-installed DRO and powerfeed eliminate field integration work, making the unit ready for production upon commissioning.
Designed as an OEM-configured vertical knee mill matching the JET JTM-1050 platform with integrated Newall C80 DRO and X-axis powerfeed accessories.
At 2,900 pounds, this machine must be rigged and positioned by qualified personnel using appropriate lifting equipment rated for the load. The installation site must have a level, reinforced concrete floor capable of supporting the machine weight, and electrical service must be verified against the machine nameplate requirements before connection. All electrical work should comply with applicable NEC standards. Power down and lock out all energy sources before performing any service, tooling changes, or adjustments after installation.
Thanks for subscribing!
This email has been registered!