

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 2200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET 691194 is a JTM-2 vertical knee mill equipped with a Newall C-80 digital readout (DRO) and an X-axis powerfeed, supplied as a factory-installed package. This configuration is designed for precision metalworking in job shops, tool rooms, and vocational environments where accurate positioning and reduced operator fatigue are priorities. The Newall C-80 DRO provides real-time axis position feedback, while the X-axis powerfeed automates table travel during milling operations. The unit ships at 2,200 pounds, indicating a full-size, rigid knee mill platform suited for demanding production and prototype work.
The JTM-2 platform is a standard Bridgeport-style vertical knee mill used in machine shops, manufacturing facilities, maintenance departments, and technical training programs. It is well suited to face milling, end milling, drilling, and boring operations on ferrous and non-ferrous materials. The included DRO and powerfeed package makes this configuration appropriate for shops looking to improve throughput and positioning accuracy without retrofitting components separately after delivery.
Designed as an OEM-configured replacement or new-installation vertical knee mill for job shop and tool room environments requiring a Bridgeport-style machine with integrated DRO and powerfeed.
Installation and commissioning of a vertical knee mill of this weight class requires qualified millwright or machine tool service personnel and appropriate lifting equipment rated for loads exceeding 2,200 pounds. The machine must be leveled on a reinforced concrete floor using precision leveling pads or mounts before operation. All electrical connections must be made by a licensed electrician in compliance with applicable NEC requirements for the voltage and phase configuration of the unit. Verify lubrication reservoirs are filled and DRO and powerfeed wiring connections are secure before initial power-on.
Thanks for subscribing!
This email has been registered!