

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 234 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET 332000 is a 3-ton capacity, 3-phase electric chain hoist designed for heavy-duty lifting in industrial and commercial environments. Rated for a 20-foot lift, it operates on a dual-voltage motor rated at 230 or 460 volts and arrives prewired for 460 volts, reducing field setup time. With a 234-pound unit weight, this hoist is built for permanent or semi-permanent overhead installations. Licensed electricians and rigging professionals handle the electrical connection and mounting, making this a fit for maintenance bays, fabrication shops, warehouses, and manufacturing floors that require reliable, repeatable vertical load handling.
The JET 332000 suits commercial and industrial applications where consistent 3-ton overhead lifting is required. Typical installations include overhead bridge crane systems, monorail trolley systems, and fixed beam mounts in production or maintenance facilities. The dual-voltage capability at 230 or 460 volts gives facilities flexibility when connecting to existing 3-phase power infrastructure. The 20-foot lift range accommodates standard bay heights in most industrial buildings. This hoist is installed by qualified rigging and electrical professionals following applicable ASME and OSHA overhead lifting standards.
Designed for use as a 3-ton, 3-phase electric chain hoist on compatible overhead beam, monorail, or bridge crane systems rated for this load capacity and configured for 230 or 460 volt 3-phase power supply.
Installation must be performed by a qualified electrician and certified rigging professional in accordance with ASME B30.16 overhead hoist standards and applicable OSHA regulations. Disconnect and lock out all power sources before making any electrical connections or performing maintenance. Verify that the supporting structure, beam, or trolley system is rated to handle the combined weight of the hoist and its maximum intended load. Do not exceed the rated 3-ton capacity at any time during operation.
Thanks for subscribing!
This email has been registered!