

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 221 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET 331500 is a three-ton electric chain hoist designed for industrial lifting applications requiring reliable, heavy-duty performance. Built for three-phase power, it operates on 230 or 460 volts and ships prewired for 460 volts, reducing setup time on installation. The unit provides 105 inches of lift, making it suitable for overhead material handling in manufacturing, maintenance, and fabrication environments. At 221 pounds, the 331500 is a substantial hoist intended for permanent or semi-permanent overhead installations. It is typically installed by certified rigging professionals or industrial maintenance technicians familiar with overhead lifting equipment and applicable safety standards.
The JET 331500 is suited for three-phase industrial environments where consistent, high-capacity vertical lifting is required. Typical applications include production facilities, warehouses, machine shops, and heavy maintenance bays. The 105-inch lift range accommodates most standard bay heights, and the dual-voltage motor allows flexibility for facilities running either 230-volt or 460-volt three-phase service. This hoist is appropriate for commercial and industrial use rather than light-duty or residential settings.
Designed as an OEM-style overhead electric chain hoist for three-phase industrial power systems requiring a 3-ton capacity unit with dual 230/460-volt motor compatibility.
Installation should be performed by a qualified rigger or industrial electrician familiar with ASME B30.16 overhead hoist standards and applicable NEC requirements for three-phase motor branch circuits. De-energize and lock out the power supply before making any electrical connections. Verify that the supporting structure is rated for the hoist weight plus the intended dynamic load before mounting. Confirm the facility supply voltage matches the prewired configuration before energizing the unit.
Thanks for subscribing!
This email has been registered!