

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 6200 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET 321502 is a heavy-duty engine lathe configured as the GH-1660ZX with a C80 spindle and collet closer taper. This machine is designed for precision turning, threading, and facing operations in professional machine shop environments. Weighing 6200 pounds, the unit is a full-size industrial lathe built to handle demanding production and toolroom work. The collet closer taper configuration allows operators to hold collets directly at the spindle, enabling faster workpiece changeover and improved concentricity during high-precision turning operations. Licensed machinists and skilled tradespeople are the primary installers and operators of this equipment.
The GH-1660ZX configuration is suited for industrial machine shops, manufacturing facilities, toolrooms, and vocational training environments where full-size metalworking lathes are required. The 16-inch swing and 60-inch bed length (as indicated by the model designation) support a wide range of workpiece sizes. The C80 spindle interface paired with the collet closer makes this machine well-suited for production runs requiring repeatable part holding and minimal setup time between cuts.
Designed as an OEM-configured industrial engine lathe replacement or new installation for professional machine shop applications requiring a GH-1660ZX platform with C80 collet closer taper.
Installation of a lathe of this weight class requires qualified rigging, a forklift or crane with adequate rated capacity, and a properly leveled, reinforced concrete floor. Power connection must be performed by a licensed electrician in accordance with applicable NEC requirements for industrial machinery. The machine must be fully leveled and anchored before operation, and all guarding must be inspected and confirmed in place prior to startup. Consult the JET installation manual for all site preparation and commissioning procedures.
Thanks for subscribing!
This email has been registered!