

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 194 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET 232000 is a heavy-duty electric chain hoist rated for 2-ton (4,000 lb) capacity, designed for industrial lifting applications in three-phase power environments. This unit supports dual-voltage operation at 230 or 460 volts and arrives prewired for 460 volts, ready for direct connection in most commercial and industrial facilities. With a 20-inch lift range and three-phase motor drive, the 232000 delivers consistent, controlled hoisting performance suited to overhead material handling in shops, warehouses, and manufacturing environments. Licensed rigging professionals and industrial electricians are the primary trades for installation and commissioning.
This hoist is built for stationary or trolley-mounted overhead lifting in three-phase powered facilities. Typical applications include steel fabrication shops, automotive service bays, machine shops, and general manufacturing environments where repetitive or heavy lifting cycles demand a reliable overhead solution. The dual-voltage motor allows facilities running either 230V or 460V three-phase service to use the same unit, reducing stocking complexity for maintenance teams.
Designed for use in three-phase 230V or 460V overhead lifting systems. Consult facility electrical drawings and applicable overhead crane or hoist mounting hardware specifications before installation. No specific compatible model numbers were provided in the product data.
Installation should be performed by a qualified electrician and certified rigging professional in accordance with ASME B30.16 standards for overhead hoists and applicable NEC requirements for motor branch circuits. De-energize and lock out the three-phase circuit before making any electrical connections. Verify that the supporting beam or trolley track is rated for the full dynamic load before mounting. Do not exceed the rated capacity; overloading a chain hoist is a life-safety hazard.
Thanks for subscribing!
This email has been registered!