

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 174 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The JET 111500 is a single-phase electric chain hoist rated for 1 ton (2,000 pounds) of lifting capacity with a 15-inch lift range. Built for industrial and commercial lifting applications, this unit operates on 115/230 volt single-phase power and arrives prewired for 230 volts, reducing setup time on the job. The hoist is designed for overhead material handling where reliable, repeatable vertical lift is required. At 174 pounds, it is a robust unit intended for permanent or semi-permanent installation on a fixed beam or trolley system by qualified rigging or maintenance professionals.
This hoist is suited for light industrial facilities, warehouses, machine shops, and maintenance bays where overhead lifting of loads up to 1 ton is a routine task. The dual-voltage capability — 115 volts and 230 volts — gives installers flexibility depending on the available power supply at the installation site. Because it ships prewired for 230 volts, most installations will require no internal wiring changes before commissioning. It is appropriate for use in single-phase electrical environments where three-phase power is not available.
Designed as an OEM-style electric chain hoist for single-phase overhead lifting systems in light industrial and commercial applications. Consult the manufacturer documentation for compatible beam trolleys or suspension hardware.
Installation should be performed by a qualified electrician and a certified rigger or qualified maintenance professional familiar with overhead lifting equipment and applicable ASME B30.16 standards for overhead hoists. Disconnect and lock out all electrical power at the panel before making any wiring connections. Verify that the support structure — beam, trolley, or monorail — is rated to exceed the hoist capacity plus the weight of the unit before mounting. Do not exceed the rated load capacity; inspect the chain, hook latch, and limit switches before placing the hoist into service.
Thanks for subscribing!
This email has been registered!