

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 130 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The ITV SPIKA NG 360 A1H is a self-contained, air-cooled undercounter commercial ice machine designed for demanding foodservice environments. It produces up to 340 lb of half dice cube ice per 24-hour period and stores 99 lb in its integrated built-in bin. The unit measures 30 inches wide and runs on R290 refrigerant, a low-GWP hydrocarbon that reduces environmental impact and lowers energy consumption compared to legacy refrigerants. The stainless steel frame is constructed from AISI 304 grade material using a four-column STIF design, and the machine features ITV's patented self-closing stainless steel door. Licensed commercial refrigeration technicians handle installation and service.
The SPIKA NG 360 A1H is built for commercial undercounter installation in bars, restaurants, cafes, hotels, and similar foodservice operations where space is limited and reliable ice production is critical. The front-only ventilation system (SFVS) allows fully built-in installation without side or rear clearance for airflow, making it compatible with tight cabinet configurations. The seal-less Never Stop pump is engineered to maintain consistent ice production even in hard-water conditions, reducing downtime associated with scale buildup and pump failures.
Designed for commercial undercounter installation as a self-contained ice machine in foodservice settings requiring half dice cube ice production.
Installation must be performed by a licensed commercial refrigeration technician qualified to work with R290 (propane-class) flammable refrigerant, in compliance with all applicable local codes and ASHRAE 15 safety standards. Disconnect and lock out all electrical power before servicing internal components. The front-only ventilation design requires no side or rear clearance, but the installer must confirm that the supply water line, drain line, and electrical service meet the unit's rated requirements before startup.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!