

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The IPEX 9838249 is a CPVC Schedule 80 spigot x female bushing used to reduce a 2-inch spigot connection down to a 1-inch female socket in industrial piping systems. Manufactured from Corzan chlorinated polyvinyl chloride (CPVC), this bushing delivers exceptional chemical resistance and performs reliably across a broad service temperature range. The Schedule 80 wall thickness provides added pressure capacity compared to Schedule 40, making it a dependable choice for chemical process lines, industrial fluid handling, and other demanding service environments. Licensed plumbers and industrial pipefitters install this fitting as part of complete CPVC pipe, valve, and fitting systems.
This bushing is suited for industrial and commercial piping applications where corrosion resistance, chemical compatibility, and long service life are required. Typical installations include chemical processing facilities, industrial plants, and systems handling acids, alcohols, alkaline solutions, salt solutions, and halogens. It is also approved for potable water systems as listed with the National Sanitation Foundation (NSF) and CSA International, extending its range to water treatment and distribution applications. The fitting integrates directly into CPVC Schedule 80 piping systems designed and manufactured to consistent dimensional standards.
Designed for use within CPVC Schedule 80 pipe, valve, and fitting systems used in chemical process, industrial fluid handling, and potable water applications requiring a 2-inch to 1-inch spigot x female bushing reduction.
Installation should be performed by a licensed plumber or qualified industrial pipefitter in accordance with applicable plumbing codes, including the IPC and local jurisdictional requirements. Solvent-cement the spigot end into the receiving female socket using CPVC-rated primer and cement, following the cement manufacturer's cure time before pressurizing the line. Shut off and depressurize the existing piping system completely before cutting in or replacing any fitting. Do not use this fitting with pipe schedules, adhesives, or solvent cements not rated for CPVC.
Thanks for subscribing!
This email has been registered!