

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The Honeywell Home Intrusion V20P2FRATPK is a hybrid security control panel kit designed for professional installation in residential and light commercial intrusion detection systems. As a hybrid panel, it supports both hardwired and wireless zones, giving integrators and low-voltage security technicians the flexibility to expand an existing wired infrastructure or deploy wireless sensors without running new wire. This kit bundles the core control panel with companion components, making it a practical all-in-one solution for a complete system build or structured upgrade. Licensed security and low-voltage electricians are the primary trade professionals who specify and install this type of equipment.
The V20P2FRATPK is suited for new construction and retrofit installations where a single panel must accommodate a mix of sensor types across multiple zones. Hybrid architecture reduces labor time by eliminating home-run wiring to every point, which is a common requirement in larger residential properties or small commercial buildouts. The kit format ensures that the panel and its associated components are sourced together, reducing the risk of component mismatch during commissioning.
Designed as an OEM-style hybrid security control panel kit for residential and light commercial intrusion detection systems. Specific compatible sensors, keypads, and peripheral devices should be verified against Honeywell Home Intrusion documentation prior to installation.
Installation should be performed by a licensed low-voltage or alarm systems technician in accordance with local codes and NFPA 731 guidelines. Disconnect all power sources, including AC and battery backup, before making any wiring connections to the control panel. Do not energize the panel until all zone wiring and peripheral connections have been verified for correct termination. Programming and zone assignment must be completed before system handoff and testing.
Thanks for subscribing!
This email has been registered!