

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The HOLDRITE HFPLTB-NP-0200-9 is a cast-in-place firestop tub box designed for 1-1/2 inch IPS drain connections with a 2 inch sleeve and a 9 inch tall profile. It is part of the HydroFlame Pro Series, a UL listed system that provides simultaneous protection against water intrusion, fire spread, smoke, and gases. The patented telescoping sleeve eliminates field cutting, and integrated locator whiskers allow technicians to locate buried sleeves after a concrete pour without destructive probing. Plumbers and fire-stopping contractors install this unit in multifamily residential and commercial construction wherever concrete-encased tub drain penetrations require code-compliant firestop protection.
This tub box is suited for cast-in-place concrete floor applications in multifamily residential buildings, hotels, assisted living facilities, and commercial structures where bathtub drain assemblies penetrate fire-rated concrete floor assemblies. The 9 inch tall configuration accommodates deeper pour conditions. Water dam and water module accessories are available separately for installations with added water-tight requirements beyond the integrated water seal.
Designed for use with 1-1/2 inch IPS drain configurations in cast-in-place concrete floor assemblies requiring UL listed firestop protection. Accessory water dam and water module components are available for installations requiring additional water-tight performance.
Installation is performed by licensed plumbers or qualified fire-stopping contractors in accordance with the UL listing requirements and applicable building codes. Confirm sleeve height and drain connection size prior to concrete pour. The telescoping sleeve should be set to the correct height before the pour; locator whiskers are used post-pour to locate the assembly without cutting. Follow all OSHA requirements for floor penetration covers during the construction phase.
Thanks for subscribing!
This email has been registered!