

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 111 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The GENIE 112632 is a heavy-duty, three-phase hoist operator head designed for commercial and industrial overhead rolling door applications. Rated at 1 horsepower, it delivers the torque needed to cycle large, heavy rolling doors reliably across multiple daily operations. The unit ships with an integrated brake, providing controlled stopping and holding power when the door reaches its open or closed position. A powder-coated black finish adds corrosion resistance for demanding installation environments. This operator head is sized for rolling doors up to 24 feet in height and is intended for installation by qualified door technicians or licensed contractors familiar with three-phase electrical systems.
This operator head is suited for commercial facilities, warehouses, loading docks, and industrial buildings where heavy rolling doors require dependable motorized operation. The three-phase power requirement makes it appropriate for buildings with existing three-phase service. The integrated brake reduces wear on mechanical stop hardware and helps maintain door position under load. Installers working on new construction or replacement projects will find this unit compatible with standard hoist operator mounting configurations for rolling doors up to 24 feet high.
Designed for use with rolling doors up to a maximum of 24 feet in height. Intended as a hoist operator head for commercial and industrial overhead rolling door systems requiring three-phase power.
Installation should be performed by a qualified door systems technician or licensed electrician familiar with three-phase wiring and local electrical codes. Disconnect and lock out all power sources before mounting or servicing the operator head. Verify that the building electrical service matches the three-phase requirements of this unit before making any connections. Consult the manufacturer installation documentation for mounting hardware specifications and operator head alignment procedures.
Thanks for subscribing!
This email has been registered!