

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 130 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The GENERAL ELECTRIC nf98u110m5cr is a modulating upflow and horizontal-flow gas furnace rated at 98% AFUE and 110,000 BTU/h output capacity. Modulating operation allows the burner to adjust heat output in small increments rather than cycling fully on and off, which improves comfort consistency and reduces temperature swings in the conditioned space. The C cabinet designation indicates a specific cabinet width class used to match the unit to ductwork and air handler installations. Licensed HVAC technicians typically handle installation and commissioning of this equipment.
This furnace is designed for residential or light-commercial applications where high-efficiency gas heat is required. The upflow and horizontal-flow configuration makes it suitable for installations in utility closets, basements, or attic spaces where the unit discharges conditioned air vertically upward or horizontally through a side outlet. The 5-ton nominal airflow capacity pairs it with larger residential or small commercial cooling systems. Installation must comply with local mechanical codes and the applicable edition of the International Fuel Gas Code (IFGC).
Designed as an OEM-style modulating gas furnace for upflow and horizontal-flow residential and light-commercial heating applications requiring a C cabinet footprint.
Installation must be performed by a licensed HVAC technician in accordance with the IFGC, local gas codes, and the manufacturer installation instructions. Shut off gas supply and disconnect electrical power before any service or connection work. Verify flue venting materials and configuration comply with 90-plus percent AFUE condensing appliance requirements, including proper condensate drainage. Do not operate the unit before all gas connections have been leak-tested and venting has been inspected.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!