EVERFLOW BRCL0114-NL PIPE FITTINGS

EverFlow BRCL0114-NL 1 IPS OR 1-1/4 SWT BRASS COMP CPLG LONG LEAD FREE

Brand: EVERFLOW
SKU: BRCL0114-NL
Availability: Out Of Stock
$39.66
$39.66
HAVE A QUESTION?

Our team is ready to help!

  • Voomi Supply

    Secure Payments

  • Voomi Supply

    Easy Returns

  • Voomi Supply

    Expert Advice

  • Voomi Supply

    Fast Shipping

Product Description

The EverFlow BRCL0114-NL is a brass compression coupling designed for piping connections. This coupling is suitable for both one inch and one and one-fourth inch piping systems. It is a lead-free option, making it ideal for plumbing applications that require safe drinking water standards.

  • Lead-free design for safe water supply
  • Compatible with 1 IPS and 1-1/4 SWT pipes
  • Durable brass construction for long-lasting performance

Product Highlights

This product provides reliable connections in plumbing and HVAC systems.

Product Information

Standard Information

  • Brand: EverFlow
  • MPN: BRCL0114-NL

Technical Specifications

  • Material: Brass
  • Pipe Compatibility: 1 IPS and 1-1/4 SWT
  • Lead-Free: Yes
EVERFLOW BRCL0114-NL PIPE FITTINGS

Vendor: EVERFLOW

EverFlow BRCL0114-NL 1 IPS OR 1-1/4 SWT BRASS COMP CPLG LONG LEAD FREE

$39.66

Vendor: EVERFLOW

EverFlow BRCL0114-NL 1 IPS OR 1-1/4 SWT BRASS COMP CPLG LONG LEAD FREE

$39.66

Related Products

Customer Support Image

Need Support?

Call Jack and His Team