EVERFLOW BRCL0012-NL PIPE FITTINGS

EverFlow BRCL0012-NL 3/8 IPS OR 1/2 SWT BRASS COMP CPLG LONG LEAD FREE

Brand: EVERFLOW
SKU: BRCL0012-NL
Availability: Out Of Stock
$284.86
$284.86
HAVE A QUESTION?

Our team is ready to help!

  • Voomi Supply

    Secure Payments

  • Voomi Supply

    Easy Returns

  • Voomi Supply

    Expert Advice

  • Voomi Supply

    Fast Shipping

Product Description

The EverFlow BRCL0012-NL is a lead-free brass coupling fitting designed for durability and performance in plumbing applications. This coupling connects two pipes with a diameter of three-eighths inch IPS or one-half inch SWT. It is suitable for both residential and commercial plumbing projects.

  • Lead-free brass material for safety
  • Compatible with 3/8 inch IPS and 1/2 inch SWT pipes
  • Ideal for various plumbing connections

Product Highlights

This coupling fitting offers robust support for pipe connections while ensuring compliance with safety regulations concerning lead in plumbing materials.

Product Information

Standard Information

  • Brand: EverFlow
  • MPN: BRCL0012-NL

Technical Specifications

  • Material: Brass
  • Connection Type: Compression
  • Pipe Diameter Compatibility: 3/8 inch IPS, 1/2 inch SWT
  • Lead-Free: Yes
EVERFLOW BRCL0012-NL PIPE FITTINGS

Vendor: EVERFLOW

EverFlow BRCL0012-NL 3/8 IPS OR 1/2 SWT BRASS COMP CPLG LONG LEAD FREE

$284.86

Vendor: EVERFLOW

EverFlow BRCL0012-NL 3/8 IPS OR 1/2 SWT BRASS COMP CPLG LONG LEAD FREE

$284.86

Related Products

Customer Support Image

Need Support?

Call Jack and His Team