

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 52 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The ENERPAC SJ2518 is a manual screw jack designed for controlled lifting, positioning, and load-holding in heavy-duty industrial and mechanical applications. Operating on a mechanical screw drive rather than hydraulic fluid, the SJ2518 delivers reliable, self-sustaining lift without pumps or hoses. The piston stroke measures 4.25 inches, and the plunger and screw diameter are both 3.25 inches, giving this jack a robust cross-section suited for high-load vertical work. At 52 pounds, it is a substantial unit intended for stationary or semi-permanent rigging setups. Millwrights, maintenance mechanics, and industrial contractors are the primary installers and operators of this equipment.
The SJ2518 is suited for industrial maintenance environments where precise, incremental lifting is required and where a load must be held in position without continuous operator input. Typical applications include machinery alignment, press work, structural support during maintenance, and load transfer operations. The mechanical screw design allows the jack to hold a load at any extension point without a separate locking mechanism, making it appropriate for sustained-load scenarios encountered in plant maintenance and heavy equipment service.
Designed as an OEM-style replacement or direct-use screw jack for industrial lifting and positioning applications requiring a manual, self-sustaining mechanical drive.
Installation and operation of this screw jack should be performed by qualified millwrights or mechanical contractors familiar with rigging and load-bearing equipment. Always verify that the supporting surface and load contact point can handle the rated load before extending the jack. De-energize, lock out, and block any equipment being serviced before placing the jack under load. Follow applicable ASME and OSHA standards for lifting and rigging operations.
Thanks for subscribing!
This email has been registered!